BIM Coordination · Office to Field

Resolve Clashes
Before the First Pour.

Field BIM connects your design models to your field crews — catching collisions, coordinating systems, and eliminating costly rework from offsite design all the way through erection.

Explore Our Apps Get Launch Updates
100%Model-driven
0Field surprises
Fewer RFIs

Available Now · Apps

Field-ready tools you can use today

While the full coordination platform is in development, our standalone apps are already shipping — built straight out of real framing and panel-shop workflows.

📐
PanelGen
Free 7-day trial

Turn MiTek wall-panel exports into production-ready wall books — panel elevations, dimensions, cut lists, and bundle summaries. Drop an EHX or EZX file, get a print-ready PDF.

EHX / EZX Windows No install No credit card
🪚
CutList
Free · Pro upgrade

Drop a MiTek EHX/EZX file and get an instant random-length material take-off — free. Try Pro free for 14 days (no card) — exact cut lengths of every stud & component, stock-length optimization, and Excel export. Files are parsed in your browser and never leave your machine.

EHX / EZX In browser No install Files stay private
No card for the trial · Buy Pro →
More tools coming
In development

We're turning more of our framing and coordination workflows into standalone apps — estimating, production tracking, and coordination. Want one for your shop?

Framing Takeoffs Production

The Problem We Solve

Construction delays and back charges stem from lack of proper design coordination between trades. Clashes get discovered post framing installation. Prefab assemblies don't fit. FieldBIM closes that gap — giving your crews real-time access to coordinated, clash-free models by bringing all trades drawings into one space.

🔍

Clash Detection

Automated collision analysis across all trades before a single crew member sets foot on site.

📐

Offsite Coordination

Align prefab, modular, and shop-fab components with live model data during the design phase.

📲

Field-Ready Models

Push coordinated models directly to field devices — foremen and supers work from the same source of truth.

🔗

Office ↔ Field Sync

Real-time feedback loop between design and construction. Changes propagate instantly in both directions.

🚚

Logistics Management

Plan delivery schedules, staging areas, and installation sequences using the live model. Eliminate conflicts between trades and ensure just-in-time delivery of prefab assemblies.

📋

RFI Reduction

Answer field questions before they become RFIs by embedding coordination data at the element level.


Design to Erection — Covered
Phase 01

Offsite Design & Prefabrication

Coordinate models across structural, MEP, and architectural disciplines. Identify and resolve all clashes before fabrication begins — eliminating costly shop drawing revisions and remake orders.

Phase 02

Logistics & Sequencing

Plan delivery schedules, staging areas, and installation sequences using the live model. Eliminate conflicts between trades and ensure just-in-time delivery of prefab assemblies.

Phase 03

Field Execution

Crews work from coordinated, current models on their devices. Issues get flagged and resolved in real time — with full traceability back to the design record.